Insufficient project planning of the design and installation of photovoltaic units on board a ship may lead to the failure of the project
Main Author: | Patsourakis, Ioannis |
---|---|
Format: | Postgraduate Thesis |
Language: | English |
Published: |
ΤΕΙ Πειραιά
2009
|
Subjects: | |
Online Access: | http://okeanis.lib2.uniwa.gr/xmlui/handle/123456789/579 |
Similar Items
-
Collaboration problems that appear in a project between people and teams as a project failure factor
by: Koborozos, Ioannis-Christos
Published: (2008) -
Ineffective communication or lack of communication between private corporations and government in joint projects through the procedures of tenders may result in the failure of the project
by: Leftheriotis, Charalampos I.
Published: (2009) -
The communication system between main contractors and subcontractors in construction projects as a project failure factor
by: Zafeirouli, Panagiota P.
Published: (2007) -
Effective project planning in modern construction projects
by: Kampas, Konstantinos T.
Published: (2011) -
Having no cooperation from the senior management may cause conflict in the project process
by: Kotsokostas, Antonios N.
Published: (2009)