Construction project scheduling

Λεπτομέρειες βιβλιογραφικής εγγραφής
Κύριοι συγγραφείς: Callahan Michael T., Quackenbush Daniel G., Rowings James E.
Μορφή: Βιβλίο
Γλώσσα:English
Έκδοση: McGraw-Hill
Irwin
Σειρά:McGraw-Hill Series in Construction Engineering and Project Management

MARC

LEADER 00000nam a2200000 i 4500
001 1/5399
010 |a 0-07-009701-1 
035 |l 10005294 
100 |a 19990123d1992 0grey0105 ba 
101 0 |a eng 
200 1 |a Construction project scheduling  |f Michael T. Callahan, Daniel G. Quackenbush, James E. Rowings 
210 |a Boston  |c McGraw-Hill  |c Irwin  |d c1992 
215 |a 439 p.  |c fig., tab.  |d 23 cm. 
225 2 |a McGraw-Hill Series in Construction Engineering and Project Management 
300 |a Includes index 
410 1 |t McGraw-Hill Series in Construction Engineering and Project Management 
606 0 |a Κατασκευαστική βιομηχανία  |x Διοίκηση 
606 0 |a Προγραμματισμός (Διοίκηση) 
606 0 |a Δομική μηχανική  |x Διοίκηση 
606 0 |a Μέθοδος του κρίσιμου μονοπατιού 
676 |a 624.068 
700 1 |a Callahan  |b Michael T. 
701 1 |a Quackenbush  |b Daniel G. 
701 1 |a Rowings  |b James E. 
709 |a McGraw-Hill 
709 |a Irwin 
801 0 |a GR  |b ΠΑ.Δ.Α. - Βιβλιοθήκη Πανεπιστημιούπολης 2  |g AACR2 
852 |a INST  |b LIBRARY  |e 19990201  |h 624.068 CAL  |p 000018195  |q 000018195  |t BK  |y 23  |z 1 
852 |a INST  |b LIBRARY  |e 19990201  |h 624.068 CAL  |p 000018196  |q 000018196  |t BK  |y 0  |z 2 
901 |a PART-IV Φ.18 
909 |b 013307 
909 |b 013308 (c.2) 
970 |a ΠΑΠΑΔΟΠΟΥΛΟΥ  |b ΚΙΚΗ  |z KIKH-1999-01 

Εγγραφή στο Ευρετήριο Αναζήτησης

_version_ 1780545243060371457
author Callahan Michael T.
Quackenbush Daniel G.
Rowings James E.
author_facet Callahan Michael T.
Quackenbush Daniel G.
Rowings James E.
author_role


author_sort Callahan Michael T.
author_variant c m t cmt
q d g qdg
r j e rje
building Campus Library II
collection LIB2 Catalog
dewey-full 624.068
dewey-hundreds 600
dewey-ones 624
dewey-raw 624.068
dewey-search 624.068
dewey-sort 3624.068
dewey-tens 620
format Book
fullrecord {"leader":"01472nam a2200361 i 4500","fields":[{"001":"1/5399"},{"010":{"subfields":[{"a":"0-07-009701-1"}],"ind1":" ","ind2":" "}},{"035":{"subfields":[{"l":"10005294"}],"ind1":" ","ind2":" "}},{"100":{"subfields":[{"a":"19990123d1992 0grey0105 ba"}],"ind1":" ","ind2":" "}},{"101":{"subfields":[{"a":"eng"}],"ind1":"0","ind2":" "}},{"200":{"subfields":[{"a":"Construction project scheduling"},{"f":"Michael T. Callahan, Daniel G. Quackenbush, James E. Rowings"}],"ind1":"1","ind2":" "}},{"210":{"subfields":[{"a":"Boston"},{"c":"McGraw-Hill"},{"c":"Irwin"},{"d":"c1992"}],"ind1":" ","ind2":" "}},{"215":{"subfields":[{"a":"439 p."},{"c":"fig., tab."},{"d":"23 cm."}],"ind1":" ","ind2":" "}},{"225":{"subfields":[{"a":"McGraw-Hill Series in Construction Engineering and Project Management"}],"ind1":"2","ind2":" "}},{"300":{"subfields":[{"a":"Includes index"}],"ind1":" ","ind2":" "}},{"410":{"subfields":[{"t":"McGraw-Hill Series in Construction Engineering and Project Management"}],"ind1":" ","ind2":"1"}},{"606":{"subfields":[{"a":"\u039a\u03b1\u03c4\u03b1\u03c3\u03ba\u03b5\u03c5\u03b1\u03c3\u03c4\u03b9\u03ba\u03ae \u03b2\u03b9\u03bf\u03bc\u03b7\u03c7\u03b1\u03bd\u03af\u03b1"},{"x":"\u0394\u03b9\u03bf\u03af\u03ba\u03b7\u03c3\u03b7"}],"ind1":"0","ind2":" "}},{"606":{"subfields":[{"a":"\u03a0\u03c1\u03bf\u03b3\u03c1\u03b1\u03bc\u03bc\u03b1\u03c4\u03b9\u03c3\u03bc\u03cc\u03c2 (\u0394\u03b9\u03bf\u03af\u03ba\u03b7\u03c3\u03b7)"}],"ind1":"0","ind2":" "}},{"606":{"subfields":[{"a":"\u0394\u03bf\u03bc\u03b9\u03ba\u03ae \u03bc\u03b7\u03c7\u03b1\u03bd\u03b9\u03ba\u03ae"},{"x":"\u0394\u03b9\u03bf\u03af\u03ba\u03b7\u03c3\u03b7"}],"ind1":"0","ind2":" "}},{"606":{"subfields":[{"a":"\u039c\u03ad\u03b8\u03bf\u03b4\u03bf\u03c2 \u03c4\u03bf\u03c5 \u03ba\u03c1\u03af\u03c3\u03b9\u03bc\u03bf\u03c5 \u03bc\u03bf\u03bd\u03bf\u03c0\u03b1\u03c4\u03b9\u03bf\u03cd"}],"ind1":"0","ind2":" "}},{"676":{"subfields":[{"a":"624.068"}],"ind1":" ","ind2":" "}},{"700":{"subfields":[{"a":"Callahan"},{"b":"Michael T."}],"ind1":" ","ind2":"1"}},{"701":{"subfields":[{"a":"Quackenbush"},{"b":"Daniel G."}],"ind1":" ","ind2":"1"}},{"701":{"subfields":[{"a":"Rowings"},{"b":"James E."}],"ind1":" ","ind2":"1"}},{"709":{"subfields":[{"a":"McGraw-Hill"}],"ind1":" ","ind2":" "}},{"709":{"subfields":[{"a":"Irwin"}],"ind1":" ","ind2":" "}},{"801":{"subfields":[{"a":"GR"},{"b":"\u03a0\u0391.\u0394.\u0391. - \u0392\u03b9\u03b2\u03bb\u03b9\u03bf\u03b8\u03ae\u03ba\u03b7 \u03a0\u03b1\u03bd\u03b5\u03c0\u03b9\u03c3\u03c4\u03b7\u03bc\u03b9\u03bf\u03cd\u03c0\u03bf\u03bb\u03b7\u03c2 2"},{"g":"AACR2"}],"ind1":" ","ind2":"0"}},{"852":{"subfields":[{"a":"INST"},{"b":"LIBRARY"},{"e":"19990201"},{"h":"624.068 CAL"},{"p":"000018195"},{"q":"000018195"},{"t":"BK"},{"y":"23"},{"z":"1"}],"ind1":" ","ind2":" "}},{"852":{"subfields":[{"a":"INST"},{"b":"LIBRARY"},{"e":"19990201"},{"h":"624.068 CAL"},{"p":"000018196"},{"q":"000018196"},{"t":"BK"},{"y":"0"},{"z":"2"}],"ind1":" ","ind2":" "}},{"901":{"subfields":[{"a":"PART-IV \u03a6.18"}],"ind1":" ","ind2":" "}},{"909":{"subfields":[{"b":"013307"}],"ind1":" ","ind2":" "}},{"909":{"subfields":[{"b":"013308 (c.2)"}],"ind1":" ","ind2":" "}},{"970":{"subfields":[{"a":"\u03a0\u0391\u03a0\u0391\u0394\u039f\u03a0\u039f\u03a5\u039b\u039f\u03a5"},{"b":"\u039a\u0399\u039a\u0397"},{"z":"KIKH-1999-01"}],"ind1":" ","ind2":" "}}]}
id lib2_1/5399
illustrated Illustrated
institution University of West Attica
isbn 0-07-009701-1
language English
physical 439 p. fig., tab. 23 cm.
publishDate 1992
publisher McGraw-Hill
Irwin
record_format marc
series2 McGraw-Hill Series in Construction Engineering and Project Management
spelling 19990123d1992 0grey0105 ba
eng
Construction project scheduling Michael T. Callahan, Daniel G. Quackenbush, James E. Rowings
Boston McGraw-Hill Irwin c1992
439 p. fig., tab. 23 cm.
McGraw-Hill Series in Construction Engineering and Project Management
Includes index
Κατασκευαστική βιομηχανία Διοίκηση
Προγραμματισμός (Διοίκηση)
Δομική μηχανική Διοίκηση
Μέθοδος του κρίσιμου μονοπατιού
624.068
Callahan Michael T.
Quackenbush Daniel G.
Rowings James E.
McGraw-Hill
Irwin
GR ΠΑ.Δ.Α. - Βιβλιοθήκη Πανεπιστημιούπολης 2 AACR2
INST LIBRARY 19990201 624.068 CAL 000018195 000018195 BK 23 1
INST LIBRARY 19990201 624.068 CAL 000018196 000018196 BK 0 2
spellingShingle Callahan Michael T.
Quackenbush Daniel G.
Rowings James E.
Construction project scheduling
Κατασκευαστική βιομηχανία Διοίκηση
Προγραμματισμός (Διοίκηση)
Δομική μηχανική Διοίκηση
Μέθοδος του κρίσιμου μονοπατιού
title Construction project scheduling
title_auth Construction project scheduling
title_full Construction project scheduling Michael T. Callahan, Daniel G. Quackenbush, James E. Rowings
title_fullStr Construction project scheduling Michael T. Callahan, Daniel G. Quackenbush, James E. Rowings
title_full_unstemmed Construction project scheduling Michael T. Callahan, Daniel G. Quackenbush, James E. Rowings
title_short Construction project scheduling
topic Κατασκευαστική βιομηχανία Διοίκηση
Προγραμματισμός (Διοίκηση)
Δομική μηχανική Διοίκηση
Μέθοδος του κρίσιμου μονοπατιού
topic_facet Κατασκευαστική βιομηχανία Διοίκηση
Προγραμματισμός (Διοίκηση)
Δομική μηχανική Διοίκηση
Μέθοδος του κρίσιμου μονοπατιού