Effective project management through applied cost and schedule control

Λεπτομέρειες βιβλιογραφικής εγγραφής
Άλλοι συγγραφείς: Bent James A. 1931-, Humphreys Kenneth K.
Μορφή: Βιβλίο
Γλώσσα:English
Έκδοση: Dekker, M.
Σειρά:Dekker, M.

MARC

LEADER 00000nam a2200000 i 4500
001 1/4935
010 |a 0-8247-9715-9 
035 |l 10011579 
100 |a 20001113d1996 0grey0105 ba 
101 0 |a eng 
200 1 |a Effective project management through applied cost and schedule control  |f edited by James A. Bent, Kenneth K. Humphreys 
210 |a New York  |c Marcel Dekker  |d c1996 
215 |a xvi, 456 p.  |c fig., tabl.  |d 28 cm. 
225 0 |a Cost Engineering  |v 26 
320 |a Includes index 
410 0 |t Cost Engineering  |f Dekker, M.  |v 26 
606 0 |a Βιομηχανικό σχέδιο διοίκησης 
606 0 |a Κόστος, Έλεγχος του 
606 0 |a Προγραμματισμός (Διοίκηση) 
615 |a ΔΙΟΙΚΗΣΗ ΕΠΙΧΕΙΡΗΣΕΩΝ 
676 |a 658.404 
702 1 |a Bent  |b James A.  |f 1931- 
702 1 |a Humphreys  |b Kenneth K. 
709 |a Dekker, M. 
801 0 |a GR  |b ΠΑ.Δ.Α. - Βιβλιοθήκη Πανεπιστημιούπολης 2  |g AACR2 
852 |a INST  |b LIBRARY  |e 20001211  |h 658.404 EFF  |p 000025885  |q 000025885  |t BK  |y 23  |z 1 
901 |a ΦΑΣΗ 11 
909 |b 024353 
960 |a ΣΕΠΤΕΜΒΡΙΟΣ 2000 
970 |a ΜΠΑΡΤΖΩΚΑ  |b ΞΕΝΙΑ  |z 2000-11 

Εγγραφή στο Ευρετήριο Αναζήτησης

_version_ 1780545242561249281
author2 Bent James A. 1931-
Humphreys Kenneth K.
author2_role

author2_variant b j a bja
h k k hkk
author_facet Bent James A. 1931-
Humphreys Kenneth K.
author_sort Bent James A. 1931-
building Campus Library II
collection LIB2 Catalog
dewey-full 658.404
dewey-hundreds 600
dewey-ones 658
dewey-raw 658.404
dewey-search 658.404
dewey-sort 3658.404
dewey-tens 650
format Book
fullrecord {"leader":"01232nam a2200325 i 4500","fields":[{"001":"1/4935"},{"010":{"subfields":[{"a":"0-8247-9715-9"}],"ind1":" ","ind2":" "}},{"035":{"subfields":[{"l":"10011579"}],"ind1":" ","ind2":" "}},{"100":{"subfields":[{"a":"20001113d1996 0grey0105 ba"}],"ind1":" ","ind2":" "}},{"101":{"subfields":[{"a":"eng"}],"ind1":"0","ind2":" "}},{"200":{"subfields":[{"a":"Effective project management through applied cost and schedule control"},{"f":"edited by James A. Bent, Kenneth K. Humphreys"}],"ind1":"1","ind2":" "}},{"210":{"subfields":[{"a":"New York"},{"c":"Marcel Dekker"},{"d":"c1996"}],"ind1":" ","ind2":" "}},{"215":{"subfields":[{"a":"xvi, 456 p."},{"c":"fig., tabl."},{"d":"28 cm."}],"ind1":" ","ind2":" "}},{"225":{"subfields":[{"a":"Cost Engineering"},{"v":"26"}],"ind1":"0","ind2":" "}},{"320":{"subfields":[{"a":"Includes index"}],"ind1":" ","ind2":" "}},{"410":{"subfields":[{"t":"Cost Engineering"},{"f":"Dekker, M."},{"v":"26"}],"ind1":" ","ind2":"0"}},{"606":{"subfields":[{"a":"\u0392\u03b9\u03bf\u03bc\u03b7\u03c7\u03b1\u03bd\u03b9\u03ba\u03cc \u03c3\u03c7\u03ad\u03b4\u03b9\u03bf \u03b4\u03b9\u03bf\u03af\u03ba\u03b7\u03c3\u03b7\u03c2"}],"ind1":"0","ind2":" "}},{"606":{"subfields":[{"a":"\u039a\u03cc\u03c3\u03c4\u03bf\u03c2, \u0388\u03bb\u03b5\u03b3\u03c7\u03bf\u03c2 \u03c4\u03bf\u03c5"}],"ind1":"0","ind2":" "}},{"606":{"subfields":[{"a":"\u03a0\u03c1\u03bf\u03b3\u03c1\u03b1\u03bc\u03bc\u03b1\u03c4\u03b9\u03c3\u03bc\u03cc\u03c2 (\u0394\u03b9\u03bf\u03af\u03ba\u03b7\u03c3\u03b7)"}],"ind1":"0","ind2":" "}},{"615":{"subfields":[{"a":"\u0394\u0399\u039f\u0399\u039a\u0397\u03a3\u0397 \u0395\u03a0\u0399\u03a7\u0395\u0399\u03a1\u0397\u03a3\u0395\u03a9\u039d"}],"ind1":" ","ind2":" "}},{"676":{"subfields":[{"a":"658.404"}],"ind1":" ","ind2":" "}},{"702":{"subfields":[{"a":"Bent"},{"b":"James A."},{"f":"1931-"}],"ind1":" ","ind2":"1"}},{"702":{"subfields":[{"a":"Humphreys"},{"b":"Kenneth K."}],"ind1":" ","ind2":"1"}},{"709":{"subfields":[{"a":"Dekker, M."}],"ind1":" ","ind2":" "}},{"801":{"subfields":[{"a":"GR"},{"b":"\u03a0\u0391.\u0394.\u0391. - \u0392\u03b9\u03b2\u03bb\u03b9\u03bf\u03b8\u03ae\u03ba\u03b7 \u03a0\u03b1\u03bd\u03b5\u03c0\u03b9\u03c3\u03c4\u03b7\u03bc\u03b9\u03bf\u03cd\u03c0\u03bf\u03bb\u03b7\u03c2 2"},{"g":"AACR2"}],"ind1":" ","ind2":"0"}},{"852":{"subfields":[{"a":"INST"},{"b":"LIBRARY"},{"e":"20001211"},{"h":"658.404 EFF"},{"p":"000025885"},{"q":"000025885"},{"t":"BK"},{"y":"23"},{"z":"1"}],"ind1":" ","ind2":" "}},{"901":{"subfields":[{"a":"\u03a6\u0391\u03a3\u0397 11"}],"ind1":" ","ind2":" "}},{"909":{"subfields":[{"b":"024353"}],"ind1":" ","ind2":" "}},{"960":{"subfields":[{"a":"\u03a3\u0395\u03a0\u03a4\u0395\u039c\u0392\u03a1\u0399\u039f\u03a3 2000"}],"ind1":" ","ind2":" "}},{"970":{"subfields":[{"a":"\u039c\u03a0\u0391\u03a1\u03a4\u0396\u03a9\u039a\u0391"},{"b":"\u039e\u0395\u039d\u0399\u0391"},{"z":"2000-11"}],"ind1":" ","ind2":" "}}]}
id lib2_1/4935
illustrated Illustrated
institution University of West Attica
isbn 0-8247-9715-9
language English
physical xvi, 456 p. fig., tabl. 28 cm.
publishDate 1996
publisher Dekker, M.
record_format marc
series Dekker, M.
series2 Cost Engineering
spelling 20001113d1996 0grey0105 ba
eng
Effective project management through applied cost and schedule control edited by James A. Bent, Kenneth K. Humphreys
New York Marcel Dekker c1996
xvi, 456 p. fig., tabl. 28 cm.
Cost Engineering 26
Includes index
Cost Engineering Dekker, M. 26
Βιομηχανικό σχέδιο διοίκησης
Κόστος, Έλεγχος του
Προγραμματισμός (Διοίκηση)
ΔΙΟΙΚΗΣΗ ΕΠΙΧΕΙΡΗΣΕΩΝ
658.404
Bent James A. 1931-
Humphreys Kenneth K.
Dekker, M.
GR ΠΑ.Δ.Α. - Βιβλιοθήκη Πανεπιστημιούπολης 2 AACR2
INST LIBRARY 20001211 658.404 EFF 000025885 000025885 BK 23 1
spellingShingle Effective project management through applied cost and schedule control
Dekker, M.
Βιομηχανικό σχέδιο διοίκησης
Κόστος, Έλεγχος του
Προγραμματισμός (Διοίκηση)
ΔΙΟΙΚΗΣΗ ΕΠΙΧΕΙΡΗΣΕΩΝ
title Effective project management through applied cost and schedule control
title_auth Effective project management through applied cost and schedule control
title_full Effective project management through applied cost and schedule control edited by James A. Bent, Kenneth K. Humphreys
title_fullStr Effective project management through applied cost and schedule control edited by James A. Bent, Kenneth K. Humphreys
title_full_unstemmed Effective project management through applied cost and schedule control edited by James A. Bent, Kenneth K. Humphreys
title_short Effective project management through applied cost and schedule control
topic Βιομηχανικό σχέδιο διοίκησης
Κόστος, Έλεγχος του
Προγραμματισμός (Διοίκηση)
ΔΙΟΙΚΗΣΗ ΕΠΙΧΕΙΡΗΣΕΩΝ
topic_facet Βιομηχανικό σχέδιο διοίκησης
Κόστος, Έλεγχος του
Προγραμματισμός (Διοίκηση)