Effective project management through applied cost and schedule control
Άλλοι συγγραφείς: | , |
---|---|
Μορφή: | Βιβλίο |
Γλώσσα: | English |
Έκδοση: |
Dekker, M.
|
Σειρά: | Dekker, M. |
MARC
LEADER | 00000nam a2200000 i 4500 | ||
---|---|---|---|
001 | 1/4935 | ||
010 | |a 0-8247-9715-9 | ||
035 | |l 10011579 | ||
100 | |a 20001113d1996 0grey0105 ba | ||
101 | 0 | |a eng | |
200 | 1 | |a Effective project management through applied cost and schedule control |f edited by James A. Bent, Kenneth K. Humphreys | |
210 | |a New York |c Marcel Dekker |d c1996 | ||
215 | |a xvi, 456 p. |c fig., tabl. |d 28 cm. | ||
225 | 0 | |a Cost Engineering |v 26 | |
320 | |a Includes index | ||
410 | 0 | |t Cost Engineering |f Dekker, M. |v 26 | |
606 | 0 | |a Βιομηχανικό σχέδιο διοίκησης | |
606 | 0 | |a Κόστος, Έλεγχος του | |
606 | 0 | |a Προγραμματισμός (Διοίκηση) | |
615 | |a ΔΙΟΙΚΗΣΗ ΕΠΙΧΕΙΡΗΣΕΩΝ | ||
676 | |a 658.404 | ||
702 | 1 | |a Bent |b James A. |f 1931- | |
702 | 1 | |a Humphreys |b Kenneth K. | |
709 | |a Dekker, M. | ||
801 | 0 | |a GR |b ΠΑ.Δ.Α. - Βιβλιοθήκη Πανεπιστημιούπολης 2 |g AACR2 | |
852 | |a INST |b LIBRARY |e 20001211 |h 658.404 EFF |p 000025885 |q 000025885 |t BK |y 23 |z 1 | ||
901 | |a ΦΑΣΗ 11 | ||
909 | |b 024353 | ||
960 | |a ΣΕΠΤΕΜΒΡΙΟΣ 2000 | ||
970 | |a ΜΠΑΡΤΖΩΚΑ |b ΞΕΝΙΑ |z 2000-11 |
Εγγραφή στο Ευρετήριο Αναζήτησης
_version_ | 1780545242561249281 |
---|---|
author2 | Bent James A. 1931- Humphreys Kenneth K. |
author2_role | |
author2_variant | b j a bja h k k hkk |
author_facet | Bent James A. 1931- Humphreys Kenneth K. |
author_sort | Bent James A. 1931- |
building | Campus Library II |
collection | LIB2 Catalog |
dewey-full | 658.404 |
dewey-hundreds | 600 |
dewey-ones | 658 |
dewey-raw | 658.404 |
dewey-search | 658.404 |
dewey-sort | 3658.404 |
dewey-tens | 650 |
format | Book |
fullrecord | {"leader":"01232nam a2200325 i 4500","fields":[{"001":"1/4935"},{"010":{"subfields":[{"a":"0-8247-9715-9"}],"ind1":" ","ind2":" "}},{"035":{"subfields":[{"l":"10011579"}],"ind1":" ","ind2":" "}},{"100":{"subfields":[{"a":"20001113d1996 0grey0105 ba"}],"ind1":" ","ind2":" "}},{"101":{"subfields":[{"a":"eng"}],"ind1":"0","ind2":" "}},{"200":{"subfields":[{"a":"Effective project management through applied cost and schedule control"},{"f":"edited by James A. Bent, Kenneth K. Humphreys"}],"ind1":"1","ind2":" "}},{"210":{"subfields":[{"a":"New York"},{"c":"Marcel Dekker"},{"d":"c1996"}],"ind1":" ","ind2":" "}},{"215":{"subfields":[{"a":"xvi, 456 p."},{"c":"fig., tabl."},{"d":"28 cm."}],"ind1":" ","ind2":" "}},{"225":{"subfields":[{"a":"Cost Engineering"},{"v":"26"}],"ind1":"0","ind2":" "}},{"320":{"subfields":[{"a":"Includes index"}],"ind1":" ","ind2":" "}},{"410":{"subfields":[{"t":"Cost Engineering"},{"f":"Dekker, M."},{"v":"26"}],"ind1":" ","ind2":"0"}},{"606":{"subfields":[{"a":"\u0392\u03b9\u03bf\u03bc\u03b7\u03c7\u03b1\u03bd\u03b9\u03ba\u03cc \u03c3\u03c7\u03ad\u03b4\u03b9\u03bf \u03b4\u03b9\u03bf\u03af\u03ba\u03b7\u03c3\u03b7\u03c2"}],"ind1":"0","ind2":" "}},{"606":{"subfields":[{"a":"\u039a\u03cc\u03c3\u03c4\u03bf\u03c2, \u0388\u03bb\u03b5\u03b3\u03c7\u03bf\u03c2 \u03c4\u03bf\u03c5"}],"ind1":"0","ind2":" "}},{"606":{"subfields":[{"a":"\u03a0\u03c1\u03bf\u03b3\u03c1\u03b1\u03bc\u03bc\u03b1\u03c4\u03b9\u03c3\u03bc\u03cc\u03c2 (\u0394\u03b9\u03bf\u03af\u03ba\u03b7\u03c3\u03b7)"}],"ind1":"0","ind2":" "}},{"615":{"subfields":[{"a":"\u0394\u0399\u039f\u0399\u039a\u0397\u03a3\u0397 \u0395\u03a0\u0399\u03a7\u0395\u0399\u03a1\u0397\u03a3\u0395\u03a9\u039d"}],"ind1":" ","ind2":" "}},{"676":{"subfields":[{"a":"658.404"}],"ind1":" ","ind2":" "}},{"702":{"subfields":[{"a":"Bent"},{"b":"James A."},{"f":"1931-"}],"ind1":" ","ind2":"1"}},{"702":{"subfields":[{"a":"Humphreys"},{"b":"Kenneth K."}],"ind1":" ","ind2":"1"}},{"709":{"subfields":[{"a":"Dekker, M."}],"ind1":" ","ind2":" "}},{"801":{"subfields":[{"a":"GR"},{"b":"\u03a0\u0391.\u0394.\u0391. - \u0392\u03b9\u03b2\u03bb\u03b9\u03bf\u03b8\u03ae\u03ba\u03b7 \u03a0\u03b1\u03bd\u03b5\u03c0\u03b9\u03c3\u03c4\u03b7\u03bc\u03b9\u03bf\u03cd\u03c0\u03bf\u03bb\u03b7\u03c2 2"},{"g":"AACR2"}],"ind1":" ","ind2":"0"}},{"852":{"subfields":[{"a":"INST"},{"b":"LIBRARY"},{"e":"20001211"},{"h":"658.404 EFF"},{"p":"000025885"},{"q":"000025885"},{"t":"BK"},{"y":"23"},{"z":"1"}],"ind1":" ","ind2":" "}},{"901":{"subfields":[{"a":"\u03a6\u0391\u03a3\u0397 11"}],"ind1":" ","ind2":" "}},{"909":{"subfields":[{"b":"024353"}],"ind1":" ","ind2":" "}},{"960":{"subfields":[{"a":"\u03a3\u0395\u03a0\u03a4\u0395\u039c\u0392\u03a1\u0399\u039f\u03a3 2000"}],"ind1":" ","ind2":" "}},{"970":{"subfields":[{"a":"\u039c\u03a0\u0391\u03a1\u03a4\u0396\u03a9\u039a\u0391"},{"b":"\u039e\u0395\u039d\u0399\u0391"},{"z":"2000-11"}],"ind1":" ","ind2":" "}}]}
|
id | lib2_1/4935 |
illustrated | Illustrated |
institution | University of West Attica |
isbn | 0-8247-9715-9 |
language | English |
physical | xvi, 456 p. fig., tabl. 28 cm. |
publishDate | 1996 |
publisher | Dekker, M. |
record_format | marc |
series | Dekker, M. |
series2 | Cost Engineering |
spelling | 20001113d1996 0grey0105 ba eng Effective project management through applied cost and schedule control edited by James A. Bent, Kenneth K. Humphreys New York Marcel Dekker c1996 xvi, 456 p. fig., tabl. 28 cm. Cost Engineering 26 Includes index Cost Engineering Dekker, M. 26 Βιομηχανικό σχέδιο διοίκησης Κόστος, Έλεγχος του Προγραμματισμός (Διοίκηση) ΔΙΟΙΚΗΣΗ ΕΠΙΧΕΙΡΗΣΕΩΝ 658.404 Bent James A. 1931- Humphreys Kenneth K. Dekker, M. GR ΠΑ.Δ.Α. - Βιβλιοθήκη Πανεπιστημιούπολης 2 AACR2 INST LIBRARY 20001211 658.404 EFF 000025885 000025885 BK 23 1 |
spellingShingle | Effective project management through applied cost and schedule control Dekker, M. Βιομηχανικό σχέδιο διοίκησης Κόστος, Έλεγχος του Προγραμματισμός (Διοίκηση) ΔΙΟΙΚΗΣΗ ΕΠΙΧΕΙΡΗΣΕΩΝ |
title | Effective project management through applied cost and schedule control |
title_auth | Effective project management through applied cost and schedule control |
title_full | Effective project management through applied cost and schedule control edited by James A. Bent, Kenneth K. Humphreys |
title_fullStr | Effective project management through applied cost and schedule control edited by James A. Bent, Kenneth K. Humphreys |
title_full_unstemmed | Effective project management through applied cost and schedule control edited by James A. Bent, Kenneth K. Humphreys |
title_short | Effective project management through applied cost and schedule control |
topic | Βιομηχανικό σχέδιο διοίκησης Κόστος, Έλεγχος του Προγραμματισμός (Διοίκηση) ΔΙΟΙΚΗΣΗ ΕΠΙΧΕΙΡΗΣΕΩΝ |
topic_facet | Βιομηχανικό σχέδιο διοίκησης Κόστος, Έλεγχος του Προγραμματισμός (Διοίκηση) |