Production and operations management

Λεπτομέρειες βιβλιογραφικής εγγραφής
Κύριοι συγγραφείς: Muhlemann Alan, Oakland John S., Lockyer Keith
Μορφή: Βιβλίο
Γλώσσα:English
Έκδοση: Pitman
Έκδοση:6th ed.

MARC

LEADER 00000nam a2200000 i 4500
001 1/15677
010 |a 0-273-03235-6 
035 |l 10009185 
100 |a 20000419d1983 0grey0105 ba 
101 0 |a eng 
200 1 |a Production and operations management  |f Alan Muhlemann, John Oakland, Keith Lockyer 
205 |a 6th ed. 
210 |a London  |c Pitman Publishing  |d c1983 
215 |a x, 566 p.  |c fig., tabl.  |d 25 cm. 
320 |a Includes bibliographical references and index 
606 0 |a Παραγωγή  |x Διοίκηση και οργάνωση 
606 0 |a Διαχείριση προϊόντων 
606 0 |a Επιχειρηματική πρόβλεψη 
606 0 |a Manufacturing resource planning 
606 0 |a Σχεδιασμός βιομηχανικών πόρων 
615 |a ΔΙΟΙΚΗΣΗ ΠΑΡΑΓΩΓΗΣ 
676 |a 658.5 
700 1 |a Muhlemann  |b Alan 
701 1 |a Oakland  |b John S. 
701 1 |a Lockyer  |b Keith 
709 |a Pitman 
801 0 |a GR  |b ΠΑ.Δ.Α. Βιβλιοθήκη Πανεπιστημιούπολης 2  |g AACR2 
852 |a INST  |b LIBRARY  |e 20000419  |h 658.5 MUH  |p 000012323  |q 000012323  |t BK  |y 23  |z 1 
909 |b 020353 
960 |a ΑΠΡΙΛΙΟΣ 2000 

Εγγραφή στο Ευρετήριο Αναζήτησης

_version_ 1780545237866774529
author Muhlemann Alan
Oakland John S.
Lockyer Keith
author_facet Muhlemann Alan
Oakland John S.
Lockyer Keith
author_role


author_sort Muhlemann Alan
author_variant m a ma
o j s ojs
l k lk
building Campus Library II
collection LIB2 Catalog
dewey-full 658.5
dewey-hundreds 600
dewey-ones 658
dewey-raw 658.5
dewey-search 658.5
dewey-sort 3658.5
dewey-tens 650
edition 6th ed.
format Book
fullrecord {"leader":"01205nam a2200325 i 4500","fields":[{"001":"1/15677"},{"010":{"subfields":[{"a":"0-273-03235-6"}],"ind1":" ","ind2":" "}},{"035":{"subfields":[{"l":"10009185"}],"ind1":" ","ind2":" "}},{"100":{"subfields":[{"a":"20000419d1983 0grey0105 ba"}],"ind1":" ","ind2":" "}},{"101":{"subfields":[{"a":"eng"}],"ind1":"0","ind2":" "}},{"200":{"subfields":[{"a":"Production and operations management"},{"f":"Alan Muhlemann, John Oakland, Keith Lockyer"}],"ind1":"1","ind2":" "}},{"205":{"subfields":[{"a":"6th ed."}],"ind1":" ","ind2":" "}},{"210":{"subfields":[{"a":"London"},{"c":"Pitman Publishing"},{"d":"c1983"}],"ind1":" ","ind2":" "}},{"215":{"subfields":[{"a":"x, 566 p."},{"c":"fig., tabl."},{"d":"25 cm."}],"ind1":" ","ind2":" "}},{"320":{"subfields":[{"a":"Includes bibliographical references and index"}],"ind1":" ","ind2":" "}},{"606":{"subfields":[{"a":"\u03a0\u03b1\u03c1\u03b1\u03b3\u03c9\u03b3\u03ae"},{"x":"\u0394\u03b9\u03bf\u03af\u03ba\u03b7\u03c3\u03b7 \u03ba\u03b1\u03b9 \u03bf\u03c1\u03b3\u03ac\u03bd\u03c9\u03c3\u03b7"}],"ind1":"0","ind2":" "}},{"606":{"subfields":[{"a":"\u0394\u03b9\u03b1\u03c7\u03b5\u03af\u03c1\u03b9\u03c3\u03b7 \u03c0\u03c1\u03bf\u03ca\u03cc\u03bd\u03c4\u03c9\u03bd"}],"ind1":"0","ind2":" "}},{"606":{"subfields":[{"a":"\u0395\u03c0\u03b9\u03c7\u03b5\u03b9\u03c1\u03b7\u03bc\u03b1\u03c4\u03b9\u03ba\u03ae \u03c0\u03c1\u03cc\u03b2\u03bb\u03b5\u03c8\u03b7"}],"ind1":"0","ind2":" "}},{"606":{"subfields":[{"a":"Manufacturing resource planning"}],"ind1":"0","ind2":" "}},{"606":{"subfields":[{"a":"\u03a3\u03c7\u03b5\u03b4\u03b9\u03b1\u03c3\u03bc\u03cc\u03c2 \u03b2\u03b9\u03bf\u03bc\u03b7\u03c7\u03b1\u03bd\u03b9\u03ba\u03ce\u03bd \u03c0\u03cc\u03c1\u03c9\u03bd"}],"ind1":"0","ind2":" "}},{"615":{"subfields":[{"a":"\u0394\u0399\u039f\u0399\u039a\u0397\u03a3\u0397 \u03a0\u0391\u03a1\u0391\u0393\u03a9\u0393\u0397\u03a3"}],"ind1":" ","ind2":" "}},{"676":{"subfields":[{"a":"658.5"}],"ind1":" ","ind2":" "}},{"700":{"subfields":[{"a":"Muhlemann"},{"b":"Alan"}],"ind1":" ","ind2":"1"}},{"701":{"subfields":[{"a":"Oakland"},{"b":"John S."}],"ind1":" ","ind2":"1"}},{"701":{"subfields":[{"a":"Lockyer"},{"b":"Keith"}],"ind1":" ","ind2":"1"}},{"709":{"subfields":[{"a":"Pitman"}],"ind1":" ","ind2":" "}},{"801":{"subfields":[{"a":"GR"},{"b":"\u03a0\u0391.\u0394.\u0391. \u0392\u03b9\u03b2\u03bb\u03b9\u03bf\u03b8\u03ae\u03ba\u03b7 \u03a0\u03b1\u03bd\u03b5\u03c0\u03b9\u03c3\u03c4\u03b7\u03bc\u03b9\u03bf\u03cd\u03c0\u03bf\u03bb\u03b7\u03c2 2"},{"g":"AACR2"}],"ind1":" ","ind2":"0"}},{"852":{"subfields":[{"a":"INST"},{"b":"LIBRARY"},{"e":"20000419"},{"h":"658.5 MUH"},{"p":"000012323"},{"q":"000012323"},{"t":"BK"},{"y":"23"},{"z":"1"}],"ind1":" ","ind2":" "}},{"909":{"subfields":[{"b":"020353"}],"ind1":" ","ind2":" "}},{"960":{"subfields":[{"a":"\u0391\u03a0\u03a1\u0399\u039b\u0399\u039f\u03a3 2000"}],"ind1":" ","ind2":" "}}]}
id lib2_1/15677
illustrated Illustrated
institution University of West Attica
isbn 0-273-03235-6
language English
physical x, 566 p. fig., tabl. 25 cm.
publishDate 1983
publisher Pitman
record_format marc
spelling 20000419d1983 0grey0105 ba
eng
Production and operations management Alan Muhlemann, John Oakland, Keith Lockyer
6th ed.
London Pitman Publishing c1983
x, 566 p. fig., tabl. 25 cm.
Includes bibliographical references and index
Παραγωγή Διοίκηση και οργάνωση
Διαχείριση προϊόντων
Επιχειρηματική πρόβλεψη
Manufacturing resource planning
Σχεδιασμός βιομηχανικών πόρων
ΔΙΟΙΚΗΣΗ ΠΑΡΑΓΩΓΗΣ
658.5
Muhlemann Alan
Oakland John S.
Lockyer Keith
Pitman
GR ΠΑ.Δ.Α. Βιβλιοθήκη Πανεπιστημιούπολης 2 AACR2
INST LIBRARY 20000419 658.5 MUH 000012323 000012323 BK 23 1
spellingShingle Muhlemann Alan
Oakland John S.
Lockyer Keith
Production and operations management
Παραγωγή Διοίκηση και οργάνωση
Διαχείριση προϊόντων
Επιχειρηματική πρόβλεψη
Manufacturing resource planning
Σχεδιασμός βιομηχανικών πόρων
ΔΙΟΙΚΗΣΗ ΠΑΡΑΓΩΓΗΣ
title Production and operations management
title_auth Production and operations management
title_full Production and operations management Alan Muhlemann, John Oakland, Keith Lockyer
title_fullStr Production and operations management Alan Muhlemann, John Oakland, Keith Lockyer
title_full_unstemmed Production and operations management Alan Muhlemann, John Oakland, Keith Lockyer
title_short Production and operations management
topic Παραγωγή Διοίκηση και οργάνωση
Διαχείριση προϊόντων
Επιχειρηματική πρόβλεψη
Manufacturing resource planning
Σχεδιασμός βιομηχανικών πόρων
ΔΙΟΙΚΗΣΗ ΠΑΡΑΓΩΓΗΣ
topic_facet Παραγωγή Διοίκηση και οργάνωση
Διαχείριση προϊόντων
Επιχειρηματική πρόβλεψη
Manufacturing resource planning
Σχεδιασμός βιομηχανικών πόρων